SOLVED /
Fusion to Grid
Live Start your room →
● Live program Global Energy

Accelerate fusion energy from lab to grid

Intelligence mapped
5 gaps 5 solutions 6 partners
View analysis →
Unsolved in this space
Neutron-resistant materials manufacturing at scale
Tritium supply chain security
Grid integration standards for pulsed power loads
13
Rooms
Join as a Innovator
Start your Solution Room in this program. AI agents find partners, map gaps, and help you build a bankable project — from day one.
🚀 Start my Solution Room
The challenge

Why this program exists

Fusion companies are solving the physics independently, but they're duplicating effort on shared blockers: materials that withstand extreme conditions, supply chains for specialized components, regulatory pathways, and capital-efficient manufacturing. No single company can solve these alone. The real barrier to commercial fusion isn't one breakthrough — it's coordinated innovation across the ecosystem.

What you do

Your journey in this program

You don't need all the answers — you need a room, a guide, and a network. Here's what the program looks like from the inside.

Wk 3
Shared Challenge Definition & IP Framework
Each Solution Room has mapped their specific technical challenge, identified which fusion companies face identical blockers, and established clear IP sharing protocols that protect competitive advantages while enabling collaboration
Wk 8
Supplier Network Mapping & Material Requirements Consensus
Room participants have completed comprehensive mapping of current supplier capabilities, identified critical gaps in the supply chain, and reached consensus on shared material specifications or regulatory requirements that work across multiple fusion approaches
Wk 14
Prototype Design & Resource Allocation
Each room has finalized their shared solution design (whether material, component, process, or standard), secured commitments for co-development resources from participating companies, and established testing protocols that accommodate different fusion technologies
Wk 18
Cross-Company Validation Testing
Prototype solutions are under active testing across at least 2 different fusion companies or approaches, with preliminary performance data being collected and shared according to established protocols
Program intelligence
The fusion industry has abundant capital and physics talent but lacks coordinated infrastructure for shared technical blockers that no single company can solve economically.
5
Gaps mapped
5
Solutions
6
Partners
3
Best practices
0
Data points
Coordinate demonstration facility strategy and tritium supply chain security as the highest-leverage interventions, since these represent existential deployment blockers that require multi-company coordination and government partnership. These areas have proven collaboration models to build from and directly enable the 2030-2035 commercial timeline that drives industry urgency.
Key gaps identified
Neutron-resistant materials manufacturing at scale
Tritium supply chain security
Grid integration standards for pulsed power loads
Deployable solutions found
SPARC tritium breeding blanket collaboration
ITER remote handling technology transfer
View full intelligence analysis →

Ready to build your solution?

Join 13 rooms already working on this challenge. Start yours in 5 minutes.